Skip to content
Saturday, October 17, 2026 All News Log in Sign up 한국어 ENG 中文 日本語 Tiếng Việt
The Korean TodayOverseas bureaus wanted first come, first served (new tab)

Society Civic Participation

Incheon Digitalizes Entire Water Supply Construction Process… ‘Integrated Management System’ Goes Live

From application to completion, handled in one place… boosting administrative efficiency and public convenience

Posted Article No. 54326

The Incheon Metropolitan City Waterworks Headquarters has built and launched an ‘Integrated Water Supply Construction Management System’ that processes every stage of water supply construction digitally. The aim is to consolidate previously scattered tasks—from application to project completion—into a single framework, speeding up processing and enhancing convenience for residents.

  [코리안투데이] Operating screen of the Incheon Waterworks Headquarters Integrated Water Supply Construction Management System © 장형임 기자

The Incheon Metropolitan City (Mayor Park Chan-dae) Waterworks Headquarters announced that it has built and put into full operation an ‘Integrated Water Supply Construction Management System’ that handles the entire water supply construction process digitally.

The system is an integrated administrative framework that processes every stage of water supply construction—from application through site inspection, design, approval, groundbreaking, and completion—in a single place. It was developed to standardize tasks that had been divided across each stage, thereby improving administrative efficiency while providing residents with faster and more convenient public services.

Key functions include electronic registration of water supply construction applications, site inspection result reporting, automatic calculation of construction costs, electronic approval for authorization, groundbreaking, and completion, and linkage with the customer information system. The system is designed so that document processing and approvals, from the application stage through the end of construction, are carried out online.

The changes residents experience are also significant. Residents can immediately check the progress of construction via text message and can be promptly informed of site inspection results and construction schedules. In effect, they can now find out how far construction has progressed without having to inquire directly. In addition, real-time collaboration between district offices and contractors has become possible, which is expected to help shorten the time needed to handle civil applications.

Going forward, the Waterworks Headquarters plans to digitize the water supply management cards that were previously kept on paper and to continuously expand linkages between systems, further shortening processing times and raising the quality of administrative services.

Jang Byeong-hyeon, head of the Incheon Waterworks Headquarters, said, ‘The Integrated Water Supply Construction Management System is a citizen-centered innovation system that standardizes work procedures and enhances administrative efficiency,’ adding, ‘We will continue to provide faster and more convenient water supply administration services through ongoing upgrades of its functions and improvements to the system.’

지역 홍보대사 신청 기자양성과정 신청 코리안투데이 지부장 신청 코리안투데이 인천강화

THE KOREAN TODAY × WIA CODE

이 기사의 WIA Code

WIA Code — 이 기사 인증

WIA Code 스캐너로 비추면 인터넷 없이 발행 사실과 위·변조 여부를 확인할 수 있습니다.
휴대폰 기본 카메라로 찍으면 스캐너 안내 페이지가 열립니다 — 기사 바로 열기

WIA Code 스트림 — 이 기사 전체가 담겨 있습니다

움직이는 코드는 스트림입니다 — WIA Code 스캐너로 약 33초 비추면 기사 전문(사진 포함)이 폰에 저장되어 인터넷 없이도 읽을 수 있습니다.

⇓ Stream.mp4 다운로드

WIA Code · 코리안투데이

© The Korean Today All rights reserved.

Related Articles

Jang Hyung-im, Reporter

Leave a Reply

Your email address will not be published. Required fields are marked *

Learn Korean free — in your languageA free YouTube channel for each language. New languages added every day. YouTube · @wiakoreanen ↗