Skip to content
Sunday, October 18, 2026 All News Log in Sign up 한국어 ENG 中文 日本語 Tiếng Việt
The Korean TodayOverseas bureaus wanted first come, first served (new tab)

English · 복지 정책 ·

Footbridge over Han River in Hanam breaks ground after eight-year wait, bringing Misa closer to Han River living area

AI 3-line summary
  1. Hanam-si held a resident briefing session and groundbreaking ceremony on the 11th for a footbridge connecting Misagangbyeon Middle School and the Misa Hangang Park area.
  2. The bridge will be built at Seon-dong 419 with a length of 105m and a width of 5.6m, and LH will bear the full total project cost of about 13.3 billion won.
  3. Completion is targeted for 2027, and once finished, residents will be able to reach Hangang Park on foot or by bicycle.

Summary written by AI from the original article · 88 languages

Footbridge over Han River in Hanam breaks ground after eight-year wait, bringing Misa closer to Han River living area

Read the full article (machine translation) → Original article (Korean): ‘8년 숙원’ 하남 한강보행육교 첫 삽… ‘미사 한강 생활권 시대’ 눈앞

AI 3-line summaryMore ›

Learn Korean free — in your languageA free YouTube channel for each language. New languages added every day. YouTube · @wiakoreanen ↗