English · 복지 정책 ·
Exit Road to Juan Industrial Complex Opens to Improve Traffic Flow on Incheon-daero
AI 3-line summary
- The Incheon Metropolitan City Construction Headquarters announced on the 5th that it has opened the exit road to the Juan National Industrial Complex, part of the Incheon-daero generalization project.
- The exit road has a total length of 480m in the Incheon direction and a width of 3.25m, and connects to Yeomjeon-ro, improving access to the Juan Industrial Complex.
- The opening is a temporary measure, and the road will be converted into an intersection once the project is complete, so drivers should check changes to traffic signs and guide boards.
Summary written by AI from the original article · 88 languages

Read the full article (machine translation) → Original article (Korean): 인천대로 일반화 사업 속도 낸 주안산단 진출로 개통… 교통 흐름 개선 기대
AI 3-line summaryMore ›

[Day 143] The First Plan We Shared

[WYD 2027 Is Korea Ready? ⑱] People with disabilities are fellow pilgrims too… From a 'WYD that helps' to a 'WYD that goes together'

Gangseo-gu Marks 3rd Anniversary of Gangseo Byeolbit Space Science Museum With October 31 Science and Culture Festival, Including Special Exhibitions, Planetarium Shows, Performances and 10 Outdoor Experience Booths

Rest in the Forest, Fall in Love with Nature…Hanam City Hosts Hanaban Healing Festival

[100 Years Ago Today] October 17, 1926 - Arirang in its 17th Day of Screening, a Sunday in Gyeongseong Two Weeks After the Dedication, and the World One Week After the Fall of Wuhan

